Analysis of Labor Coefficients Based on Labor Productivity in Palembang City

Politeknik Negeri Sriwijaya ROR
Download PDF

Abstract

The construction industry is a major contributor to Indonesia’s infrastructure development, covering various civil engineering works, including buildings, highways, bridges, and other infrastructure facilities. The achievement of construction project objectives depends on effective planning, appropriate management practices, and the competence of the workforce involved. Effective construction planning requires competent workers and adequate productivity. Project scheduling helps organize activities, allocate resources, and control progress, with work durations largely influenced by labor requirements and productivity. In Indonesia, labor needs are estimated using standardized coefficients from the Indonesia National standard (SNI) and Work Unit Price Analysis (AHSP), which serve as references for construction planning and cost estimation. Field data were obtained through on-site surveys conducted using interviews and questionnaire distribution. The questionnaire responses were subsequently compiled and analyzed using Microsoft Excel to identify the types of work, their respective cost value, and time required to complete each activity. The collected data were further examined to evaluate workforce productivity and establish the labor coefficients reflecting actual construction site performance. Based on the data processing result, the daily working time was established as 8 hours. For reinforcement work, 4 workers were required to complete a work volume of 65 kg within 5 days. Based on the field observations, the labor productivity of reinforcement workers was determined to be 130 kg/worker-day, with a labor coefficient of 0,0077 OH/kg. For formwork activities, 5 workers were required to complete a work volume of 1,5 m² within 5 days. The resulting labor productivity of carpenters was 0,3 m²/worker-days, with a corresponding labor coefficient of 0,3333 OH/m². Furthermore, for concrete casting activities, 4 workers were required to completed a work volume of 0,8 m³ within 5 days. The resulting labor productivity of concrete workers was 3,2 m³/worker-day, with a corresponding labor coefficient of 0,3125 OH/m³. Following the data analysis, a comparative assessment was conducted between the labor coefficients obtained from field observations and those specified in the AHSP issued by the PUPR of Palembang City. For reinforcement work, the labor coefficient obtained from the field observations was 0,0077 OH/kg, compared with 0,0070 OH/kg specified in the AHSP. For formwork activities, the field-based labor coefficient was 0,3333 OH/m², whereas he AHSP coefficient was 0,3300 OH/m². Meanwhile, for concrete casting activities, the labor coefficient obtained from the field observations concrete casting activities, the labor coefficient obtained from the field observations was 0,3125 OH/m³, compared with 0,2750 specified in the AHSP.

Keywords:

REFERENCES

Similar Articles

11-12 of 12

You may also start an advanced similarity search for this article.